Project Details

General Information:

  • Delivery: Construction Manager/General Contractor (CMGC)

  • Owner: Los Angeles County Metropolitan Transportation Authority (Metro)

  • Owner Engineer Estimate (Construction): $520 Million

  • Location: Los Angeles

Project Overview

The Project will include construction of new run-through tracks over the US-101 freeway connecting to the mainline tracks on the West Bank of the Los Angeles River. The Project scope includes, as further described in the Project Requirements:

  • Construction of a new run-through track viaduct structure that spans over the US-101 freeway, Center Street and the Amtrak lead track.

  • Construction of new embankment structures between the viaduct and First Street bridge.

  • Construction of a renovated Platform 3 at LAUS with run-through track service to the mainline tracks on the west bank of the Los Angeles River, including a ramp from Platform No. 3 to the US-101 viaduct structure.

  • Construction of new sound walls and retaining walls in the northern section of the Project near William Mead Homes; (e) Construction of "Quiet Zone Ready" improvements at North Main Street grade crossing on the west bank of the Los Angeles River.

  • Construction of Commercial Street active transportation improvements; and

  • Completion of associated utility relocations.

Credit Metro